Projects carried out

Work carried out in Congo

Applied cycle: PAINT SYSTEM 04
sandblasting Sa3;
Application of primer;
Application of epoxy intumescent;
polyurethane finish Application: DFT 3,5mm / 6,6mm

BRIDGE ON THE BOSPHORUS - Istanbul

CYCLE APPLIED:
inner surfaces
Sandblasting Sa 3 with garnet;
TSA Zn 99,9
the sealer application

exterior surfaces:
cycle in accordance with ISO 12944 FOR ENVIRONMENT C5 MH
Sandblasting Sa 2½;
Application of Zinc with epoxy, for 60μ;
epoxy intermediate application to 200μ;
Application of polyurethane, for 60μ

Villa & Bonaldi Chartek

Applied cycle

  • sandblasting Sa 2½;
  • Zincante epossidico
  • Chartek fireproofing
  • Polyurethane finish

CORDIOLI & C. SpA Railway Bridge – Bordeaux (Fr)

Cycle applied

  • Sandblasting Sa 3
  • Metallization Zn/Al 85/15
  • Sealer epoxy
  • Polyurethane finish

METALLURGICA MEDOLAGO

Ciclo Applicato

  • Sandblasting Sa 2½;
  • Inorganic zinc
  • Silicone finish

  • Sandblasting Sa 2½;
  • Zinc epoxy;
  • Chartek Fireproofing;
  • Polyurethane finish

Astaldi Spa - Hangar building c/o Air force base of Amendola (FG)

Cycle Applied : hot galvanized structures

  • Epoxy primer
  • intumescent water paint
  • polyurethane finish

Pont Schuman – Lyon (FR)

Client: Grand Lyon
Cycle applied ACQPA C4ZNV:

  • Blasting Sa 3
  • TSA Zn / Al 85/15, for a thickness of 120μ;
  • Sealer, for a thickness of 30μ
  • Intermediate epoxy, for a thickness of 70μ
  • polyurethane finish, with a thickness of 50μ.

Brasilia Stadium

Client: Farem SpA
Cycle applied:

  • Blasting Sa 3
  • Metallization Zn / Al 85/15 to a thickness of 120/1000μ;
  • Sealer for a thickness of 30μ
  • Intermediate epoxy to a thickness of 100μ
  • polyurethane finish to a thickness of 60μ.

Restoration work of art U.S. Embassy in Rome "Sabot"

Sculptor: Alexander Calder
Cycle applied:

  • Blasting Sa 3
  • Metallization Zn / Al 85/15 to a thickness of 120μ;
  • Epoxy Sealer to a thickness of 30μ
  • Topcoat.

Redevelopment district of Milan "City Life"

Architect: Zaha Hadid
Cycle applied:

  • blasting to Sa 2 ½
  • Epoxy Primer
  • Polyurea coating with a thickness of 2mm
  • polyurethane finish Florurata.

Calatrava Bridge - Venice

Architect: Santiago Calatrava
Cycle applied:

  • Blasting Sa 3;
  • Metallization Zn / Al 85/15 to 120μ;
  • Sealer for a thickness of 30/40μ;
  • Intermediate for a thickness of 150μ;
  • polyurethane finish to a thickness of 50μ.

West Franklin Project

Client: Rosetti SpA
Cycle applied:

  • Blasting Sa 3
  • TSA At a thickness of 350μ 99.5
  • Sealer silicone to a thickness of 30μ

Intesa San Paolo Tower - Turin

Architect: Renzo Piano
Cycles applied

  • blasting to Sa 2 ½
  • Zinc epoxy to a thickness of 60μ
  • Intermediate
  • to a thickness of 180μ
  • finish to a thickness of 50μ

  • Blasting Sa 3;
  • Al Metallization to 200μ
  • Sealer for a thickness of 30μ
  • Intermediate to a thickness of 120μ
  • Polyurethane finish to a thickness of 50μ.

Consortium for cleaning

Cycle applied:

  • Pressure washing to 400 bar.
  • Reconstruction of damaged areas.
  • Cementitious waterproofing coating for crystallization.

Poliurea

Cycle applied:

  • Peening.
  • Application bottom wet epoxy.
  • Application epoxy primer cooperative.
  • Application pure polyurea, 2 mm thick.
  • Application flexible polyurethane finish to 60 microns.

Doppelmayr

Cycle applied on hot dipped galvanized surfaces.

  • Light Sand
  • Application of epoxy primer 40 micron thickness.
  • Application of polyacrylic finish for a thickness of 60 microns.

Alcoa

Cycle applied

  • Dry high pressure 1500 bar.
  • Application of high build epoxy coating 500 microns.

MOSE - Venice

Client: Consorzio Venezia Nuova
Cycle applied:

  • blasting to Sa 2 ½
  • Primer for a thickness of 50μ
  • epoxy reinforced with glass flakes, for a thickness of 500μ
  • epoxy reinforced with glass flakes, for a thickness of 500μ.

AUTOVIE VENETE - Ponte Silea

Cement cycle

  • Concrete protection systed
  • High pressure water cleaning;
  • Holas and cleaning repairs using apoxy mortar
  • Acrylic primer application
  • Top-coat application;
Steel protection system
  • Abrasive blast cleaning to Sa 2½
  • Apoxy zinc application up to 60µ Dry film thickness;
  • Apoxy intermediate application 80µ Dry film thickness
  • Polyacrylic finish application up to 50µ Dry film thickness.

RIZZANI DE ECCHER S.p.A. - Cable-stayed bridge

cycle applied

  • High prassure water cleaning;
  • Holas and craking repair;
  • Epoxy primer application;
  • Elastomeric coating application