Tel +39 0421.760038     Fax +39 0421.760441     Mail : info@faidsrl.it

Works

Work carried out in Congo

Applied cycle: PAINT SYSTEM 04
sandblasting Sa3;
Application of primer;
Application of epoxy intumescent;
polyurethane finish Application: DFT 3,5mm / 6,6mm
The application of intumescent paint prevents, in the event of a fire, the increase in temperature from causing deformations or the collapse of the structure.

Villa & Bonaldi Chartek

Applied cycle
sandblasting Sa 2½
Zincante epossidico
Chartek fireproofing
Polyurethane finish
Chartek is an intumescent paint that, in the event of a fire, increases in thickness and volume as the temperature increases, insulating the structure for a certain period of time.

METALLURGICA MEDOLAGO

Ciclo Applicato

  • Sandblasting Sa 2½;
  • Inorganic zinc
  • Silicone finish

  • Sandblasting Sa 2½;
  • Zinc epoxy;
  • Chartek Fireproofing;
  • Polyurethane finish

Astaldi Spa - Hangar building c/o Air force base of Amendola (FG)

Cycle Applied : hot galvanized structures

  • Epoxy primer
  • intumescent water paint
  • polyurethane finish

New Convention Center Roma EUR "Nuvola"

Architect: Massimiliano Fuksas
Cycles Applied

  • Sandblasting Sa 2½;
  • Zinc epoxy to a thickness of 60µ;
  • Intermediate for a thickness of 120µ;
  • Polyurethane finish for 50µ.

  • Sandblasting Sa 2½;
  • Epoxy primer for 60µ;
  • Intumescent R60’;
  • Polyurethane finish to a thickness of 50µ


Self-leveling cement-resin application on the pavement of suspended walkways.