Cycles Applied: CS/AFC/TS/001 REV.03-04
Sandblasting Sa 3;
TSA Al 99,5% DFT 200µ
West Franklin Project
Client: Rosetti SpA
Cycle applied:
- Blasting Sa 3
- TSA At a thickness of 350μ 99.5
- Sealer silicone to a thickness of 30μ
Doppelmayr
Cycle applied on hot dipped galvanized surfaces.
- Light Sand
- Application of epoxy primer 40 micron thickness.
- Application of polyacrylic finish for a thickness of 60 microns.
Alcoa
Cycle applied
- Dry high pressure 1500 bar.
- Application of high build epoxy coating 500 microns.
RIZZANI DE ECCHER S.p.A. - Cable-stayed bridge
cycle applied
- High prassure water cleaning;
- Holas and craking repair;
- Epoxy primer application;
- Elastomeric coating application